Loading…
Crossings Republik, Ghaziabad 201016
Sign in to join the discussion
The two-monsoon waterproofing test is the most credible quality assessment possible. Your report of zero seepage validates that the construction was done right in Phase 4. This is the kind of specific data point that other Mywoods prospective buyers need — not general impressions.
The power backup limitation is a genuine Ghaziabad-specific issue. Summer power cuts in this belt can run 4-6 hours in peak heat months. 500 watts won't run an AC, which in June-July temperatures is a real problem. Budget ₹25,000-30,000 for a good inverter+battery setup from day one.
15-18% appreciation in 2 years on ₹58 lakh is around ₹9-10 lakh gain. In absolute terms modest, in annual percentage terms around 8% which is in line with NCR fringe area growth. As metro connectivity approaches this should accelerate. Good timing on the purchase.